Basic parameters of the Industrial Grade Air Drying System
Max. Temperature | 140 ℉ |
Set Pressure | 30-175 psi |
Air Inlet/Outlet | 3/4″ NPT |
Drain Type | Auto Drain |
Manual included? | Yes |
Accessories | 2 x 3/4″ NPT Fittings, 1 x Thread Seal Tape. Helps Connect to Your Air Supply Firmly. |
Installation and Operating
Preparation
- The assembly of all calibrations shall meet the maximum flow requirement.
- Please clean the port and fitting before installation, it will effectively avoid bringing dust to the air path.
- Pay attention to the direction of air flow and the arrow pointing on the product body if correct, minding port and thread size if match.
Pressure Adjustment
- Pull up the knob of the pressure gauge, rotate:
If you do clockwise rotation, pressure will rise steadily. Pressure will down when you rotate counterclockwise. - Stop turning after reaching the required index and lock down the knob, forget this step you may face a leakage problem.
Dial Reading
- Make sure that the pressure gauge is tightly installed on the main body, and pay attention to whether the reading rises and falls smoothly while adjusting pressure.
Service Indicator
- The service indicator on the coalescing filter signals when the filter element needs to be replaced.
- When the indicator pops up, the element must be replaced.
Filters&Desiccant Dryer
- The first filter stage separates particles > 5μm as well as condensed water and oil.
- The second filter fineness 0.01μm, separation degree 99.998% related to a particle size > 0.01μ.
- The third stage desiccant dryer with desiccant beads completes the final air cleaning work.
There are no reviews yet.